CHECKLIST FOR EXCAVATION

CHECKLIST FOR EXCAVATION
Project / Job No:                                                                                                                             Location: Villa no
Project Name:                                                                                                                                 Area / Quantity:                            
Drawing No:                                                                                                                                     Date:
S.No
DESCRIPTION
YES
NO
NA
REMARKS
1
Is the soil investigation report available on-site?




2
Are the latest "Good for Construction" drawings available?




3
Is the LAYOUT, ALIGNMENT AND SIZE of Excavation marked on the ground as per excavation plan




4
Have Temporary bench marks ( TBM) been established?




5
Are all the requirements met for maintaining dewatering?




6
Has the required depth of excavation been achieved?




7
Has proper shoring and strutting been done in loose soils?




8
Any Ground water seepage observed? If yes, special approved soil strengthening treatment to be done.




9
Check whether FOUNDING STRATA is suitable for laying PCC i.e., free from any soft pockets, Black soil, loose soil etc. (if NO, remove soft pockets and fill with Lean Concrete/Sand.




10
Check for STABILITY of Side Slopes.  Is it acceptable?




11
Is the excavation barricaded at a distance of 1 meter?