Work Breakdown Structure for Heavy Industry Project

Work breakdown structure (WBS) is a bunch of fundamental activities that organize the single hammock activity (also hammock task) into the feasible category. 

The Project Management Body of Knowledge (PMBOK) illustrates the work breakdown structure as an "output-oriented hierarchic disintegration of the work to be executed by the enterprise unit."

Here is the WBS of Heavy Industry Project

   - PROJECT START
   - GENERAL
   - MILESTONES
   - PROJECT COMPLETION
   - MOBILIZATION
   - PROJECT TIME SCHEDULE
   - DESIGN STAGE
   - PRELIMINARY DESIGN STAGE
           Authorities Approval
           Preliminary Design Report
   - FINAL DETAILED DESIGN   - MATERIALS
   - PROCUREMENT
   - SUBCONTRACTORS
   - SHOP DRAWINGS
   - CONSTRUCTION STAGE
   - INFRASTRUCTURE
   - BULK EARTHWORK
   - ROAD WORK
   - STORMWATER WORK
   - SHALLOW STORMWATER NETWORK
   - DEEP STORMWATER NETWORK
   - SANITARY SEWER WORK
   - GENERAL SANITARY WASTE COLLECTION SYSTEM
   - CHEMICAL INDUSTRY WASTE COLLECTION SYSTEM
   - MIXED INDUSTRY WASTE COLLECTION SYSTEM
   - FOOD INDUSTRY WASTE COLLECTION SYSTEM
   - TELECOMMUNICATION WORK
   - FRESHWATER WORK
   - HEAVY INDUSTRY PLOT NETWORK